Demo environmentEverything here is sample data — explore freely. The whole database resets every night at midnight (Casablanca), including anything you add.
Skip to content

Operations · 19 June 2026 · 3 min read

The stage between “yes” and “shipped”

Saisie — data entry — is a real job, and the systems that pretend it is not lose a day in the gap.

Nearly every order system models the same five states: placed, confirmed, shipped, in transit, delivered. It is clean, it fits on a slide, and it is missing a day.

Between the customer saying yes on the telephone and the parcel being handed to a courier, somebody has to type the order into whatever system actually moves boxes. Pick the right variant, resolve the address into something a courier will accept, print a label, put it on a shelf. In a Moroccan operation it is called saisie, it is often a different person from the one who made the call, and it routinely takes longer than the call did.

What collapsing it costs

If your model goes straight from confirmed to shipped, then every hour spent in data entry is invisible, and it is attributed to whichever neighbour you are measuring. Confirmation looks slow, or dispatch looks slow, and neither team recognises the number as theirs.

Worse, nobody owns the backlog, because the backlog does not appear on any screen. A hundred confirmed orders waiting to be entered look exactly like a hundred orders about to ship.

So it is a stage

Saisie has its own queue, its own operator, and its own timestamp. Which means you can see it building up, you can see how long it takes, and you can tell the difference between a confirmation problem and a keyboard problem. That is the entire argument for seven stages instead of five.


← All posts

Stop shipping to people who never said yes.